Protester Said Incomplete Form Wasn’t a Problem Because the Agency Already Had the Information. Why Didn’t that Argument Fly with GAO?July 10, 2023
Construction Site Was an “Absolute Mess.” Why Wasn’t the Mess a Differing Site Condition?June 29, 2023
If the Contract Doesn’t Indicate the Condition of the Site, There’s No Claim for a Differing Site ConditionJune 28, 2023
Solicitation Wasn’t Consistent with Customary Commercial Practices. Why Did GAO Let It Slide?June 28, 2023
If the Solicitation Says Discuss Recruitment in San Antonio, Your Proposal Better Contain the Words “San Antonio”June 27, 2023
COFC Sustains Multiple Protests in Massive IT Procurement. Why Did the Court Think the Evaluation Was Too Glib?June 26, 2023
DMCA Said Contractor Improperly Allocated G&A Costs. ASBCA Thought Agency May Have a Point.June 26, 2023
Agency Wasn’t Enamored with Protester’s Oral Presentation. GAO Says Agency’s Criticisms Were Justified.June 23, 2023
Previous Contractor Submitted Claim. Can the Claim Be Amended to Add the Current Contractor?June 23, 2023
Agency Rescinded Challenged CPARS. Why Didn’t the Rescission Moot the Contractor’s Appeal?June 23, 2023
Unfortunately Protester’s Most Relevant Past Performance Reference Was Its Worst Past Performance ReferenceJune 22, 2023
Government Contracting Is Risky: An Agency Isn’t Obligated to Draft a Goldilocks Solicitation for Each OfferorJune 22, 2023
Air Force Destroyed Contractor’s Container. Contractor Claimed a Trillion Dollars in Damages.June 22, 2023
GAO Sustains Challenge to Price Evaluation. How Did the Agency Fumble the Realism Analysis?June 21, 2023
Contractor’s Expert Died After Discovery Was Completed. Could the Contractor Use a Substitute?June 21, 2023