Contractor Proposed a Solution to Address Defective Specifications, But the Agency Rejected It. Was the Contractor Entitled to Costs Incurred in Preparing the Rejected Solution?

While performing, the contractor discovered that the floor it was working on could not support the weight of equipment needed for the project.